Комментарии:
Very Excellent 🌺🌹
ОтветитьDear Sir
I had a problem in Primavera P6, the problem is Performance % Complete and Schedule % Complete, can not roll up to Project level, but it is already rolling up to WBS Level, and please note that I already assign materials on activities.
Please anyone can give advice, to solve this problem, I use Ver. 19.12 and Ver. 21.12.
Thanks
Brother, How can I get all of your lessons?
Ответитьthanks too much for the review and valued information
ОтветитьHello, Thanks for the information again, but why when I export from p6 to excel the arrangement of activity ID was not in order, Do I need to fix the save excel before importing to P6. Its says the application has been intercepted please note the event code for reference. Event code TP CAT-3080-C. Thanks and God bless.
Ответитьvery nice
ОтветитьIt does not work with decimals... Any suggestion?
ОтветитьHelpful video, thanks for sharing.
Ответитьhi ,i need a help ,when iam importing an excel file to primavera iam geting an error message that "The User Preferences used to create this Excel file are not the same as your current preferences. Importing this file could corrupt your data"
ОтветитьVery Nice regd MuthuPMP
ОтветитьHello, nice work! Congratulations!!
Please, let me ask you this: In your excel file "WBS-Activity-List-Full.xlsx"
Q1. What is the complete name of the cell A3 ("BOQ..?")? And what it is referred to those letters ("A, B, C", etc)?
Q2. What information do you have in the column B, "DIV"? Why is it useful?
Thank you!
The moment I assign a 0 bugeted hour resource , all durations come to 0
ОтветитьHow to import manhours from excel to primavera
ОтветитьHi, I believe that you should order the ID activities for copy the dates
ОтветитьSo do you add an additional resource (CostPlanning) on top of the resource that is aleady assigned? Or can you use the reosurce that ois already in there?
ОтветитьBut, is this the right way to add cost to activities? Typically it has to be by adding labor / material / Expenses to each activity. And that will drive the cost of the activities.
ОтветитьGood job! This is very helpful. So updating the budgeted units updates the budgeted cost.
ОтветитьHello! i am a young planner and i have a couple of questions regarding this topic;
1. Would you please elaborate the difference between the expense loaded from BOQ and the cost loaded for resources.
Is there any reason you wouldn't want to do this with something as simple as the default "budgeted total cost" or something like that?
ОтветитьThanks - i did and complete my job
ОтветитьMy budgeted cost shows 0 after importing. Please help.
Ответитьi got a better idea by watching this
ОтветитьOmar , you need to go to your setting in resource and select unit and change it to 1 instead of 8 per hour and also make sure your max uni is 1
ОтветитьHello , In order to avoid changing duration you need to go to the project before assigning resource and in resource setting , uptick Drive activity be default
ОтветитьOmar, probably your resource isnt "material" resource type. then it multiples with 8 hours.
ОтветитьWhen im importing the budgeted total cost , the budgeted total cost in primavera is multiplying by 8 i dont know why ? Please help . Thank you
Ответить