De Shuttering of Slab and Beam | Live from Site |

De Shuttering of Slab and Beam | Live from Site |

Civil Engineer Deepak Kumar

5 лет назад

4,394 Просмотров

The “wooden planks” placed horizontally supporting your roof (slab) is called 'shuttering' and the “wooden logs” placed vertically supporting the shuttering is called 'formwork'. The removal process is called Deshuttering. The Formwork can be removed only after concrete has achieved sufficient strength.

Share, Support, Subscribe!!!
Twitter: https://twitter.com/erdeepak4kumar5
Facebook: https://www.facebook.com/er.deepak4kumar5
Facebook page: https://www.facebook.com/er3deepak4kumar5/
Instagram: https://www.instagram.com/er.deepak4kumar5/
Pinterest: https://in.pinterest.com/erdeepak4kumar5/
Tumblr: https://www.tumblr.com/blog/erdeepak4kumar5
StumbleUpon: https://www.stumbleupon.com/stumbler/erdeepak4kumar5
Youtube: https://www.youtube.com/c/ErDeepakKumar


#DeShuttering #Dismentaling #SlabBeam

Тэги:

#deshuttering_period_of_slab #removal_of_formwork #formwork_for_beams_columns_and_slabs #how_to_remove_formwork #deshuttering_time_for_slab_as_per_is_456_2000 #props_of_slab #deshuttering_period_of_rcc_members #curing_days_for_rcc_slab #Page_navigation
Ссылки и html тэги не поддерживаются


Комментарии: