Комментарии:
Can this robot haul rails and brackets, weld brackets in place so that they only need minor adjusting not hours of squaring up the angle brackets, wire and install conduit, and think for itself? If not, what a waste of money.
ОтветитьGood ji
ОтветитьAí negão,aja poço 100% kkkkkk
ОтветитьWhat a joke, so much just to drill few holes , and guess what , robot out , installers in to do the job !
Extraordinary theology !
The robots going to have an accident lol
Ответитьecco perche' le piccole ditte vi fregano tutti gli ascensori .
perche pensate a questi brevetti del cazzo.
peccato che poi non passano a mettere l'olio sulle guide per 3 anni.
cosi poi possono cambiare i pattini.
bravi bravi
Amazing
Ответить👍
Ответитьgood working bro
ОтветитьHiç o duvarda demire denk gelmeden delip kolaylıkla dubel cakıyor amk yalan makınası
ОтветитьIf the shaft is steel, can the robot do welding for brackets?..
ОтветитьCongratulations another great innovative way to destroy jobs and reward corporate masters
ОтветитьYeah well I guess theirs a reason why new elevators don't last long
Ответить*Automated Shaft Drilling Robot
ASDR
P.S.: Or as I'll call it, R1D1
I see the robot prefers Hilti tools!!
ОтветитьWhat if it hits a rebar
ОтветитьStill a long ways away from replacing a human, and a lot can go wrong with this, but soon all the simple repetitive tasks will be done by these
ОтветитьHoly crap well done Schindler!
ОтветитьWhere it is?
ОтветитьDoes it belt the lift too? Could you teach it to put in entrances too and run the wiring for the indicators and buttons...thanks.
ОтветитьIs that a 5500?
ОтветитьSo it drills holes with the 6 axis robot for framing , that's a waste of resources
Ответить